Maintainence Report

Supervisor Visited the job weekly
Completed Litter pickup of ground areas
Completed sweeping or blowing of walkways
High priority areas were Visited weekly
V Ditches were cleaned and inspected
Weep screen inspectedand cleaned in rotation section

Lawn Maintainence

Fertilization of truf occoured
Truf was moved and edged weekly

Shrub Maintainence

Shrubs trimmed according to rotation schedule
Fertilization of Shrubs occoured

Ground cover and flowerbed Maintainence

Watering of flowerbeds Completed and checked

Irrigation System

Heads were adjusted for maximum coverage
Repairs were made to maintain an effective system
Controllers were inspected and adjusted
Main line was repaired
Valve(s) was repaired

Rotation

This month's expected rotation schedule

Extra Information

Notes